Execute a Plan or Reconcile Existing Work

Use implementation when planned work still needs to happen. Use reconciliation when the work has already been committed outside the OAT execution flow and the project ledger needs to catch up. Both require an existing project; neither is a way to start an unplanned feature.

Your situationSkillWhat changes
An approved plan has pending tasksoat-project-implementCode, verification evidence, project tracking and possibly a PR
Manual commits are missing from project trackingoat-project-reconcileTracking artifacts only, after you confirm the commit-task mapping

If you are unsure which situation applies, start with project progress. The broader implementation execution guide explains dispatch, worktrees and review boundaries.

Terms used on this page:

  • Active project: the project OAT works on in this checkout when you do not name one. Its path is stored as activeProject in .oat/config.local.json, a local file that is not committed.
  • Synced project: a project whose artifacts travel on their own Git ref on origin (refs/oat/projects/<name>) instead of on your branch. OAT saves its tracking changes with oat project push, which pushes to origin. See Picking up projects.
  • Bookkeeping commit: a commit that contains only OAT tracking files such as plan.md, implementation.md and state.md, kept separate from code commits.
  • Dispatch policy: the project's rule for which models and effort levels OAT may use when it launches subagents, such as phase implementers and reviewers. See Dispatch Policy.
  • HiLL checkpoint (human-in-the-loop): a plan phase after which implementation stops and waits for you before continuing. See HiLL Checkpoints.
  • Gate: a configured check, usually an independent review run by another model, that must pass before the workflow continues. The implementation exit gate runs after the final code review. See Workflow gates.

oat-project-implement

Run the approved plan. OAT works through the plan's phases (groups of tasks in plan.md) in order, has each phase implemented and then independently reviewed, and records progress in the project's tracking files. The plan, rather than the number of available agents, decides the order and which phases, if any, may run in parallel in separate worktrees.

Needs an active OAT project: yes. If none is set, the skill asks for the project name and saves it as the active project.

Invocation:

/oat-project-implement --dry-run
/oat-project-implement

The first invocation resolves the project, checks which subagents are available, reads the plan and prints the proposed schedule and the worktrees it would create. It does not dispatch phases, merge, commit or write project artifacts, although it may still set the active project pointer or pull a synced project. It is not proof that implementation or its tests have passed. The second begins execution. These are agent skill invocations, not oat terminal subcommands; use the invocation syntax your host supports.

The number of fix attempts after a failed review comes from oat_orchestration_retry_limit in the project's state.md (default 2, range 0–5). The skill's argument hint also lists --retry-limit, but no step reads that flag, so passing it changes nothing.

Prerequisites: Select an existing project with an approved, complete plan.md whose readiness points to oat-project-implement. The lifecycle artifacts needed by its workflow mode must be available. Finish a quick plan that is not implementation-ready through quick-start planning; having task headings alone does not make it ready. The dispatch skills it relies on (oat-project-dispatch-subagents, oat-dispatch-subagents and subagent-orchestration) must be installed; if one is missing, the skill stops and prints the install command.

A dispatch policy must be set before any phase work. OAT reads it from config (workflow.dispatchPolicy.*, or the older workflow.dispatchCeiling keys) or from oat_dispatch_policy in the project's state.md. If none is set, an interactive run asks you to choose one and saves your choice to state.md; choosing Leave Unresolved stops the run. A non-interactive run stops with BLOCKED: … dispatch policy is unresolved. On Codex, if launching subagents needs your authorization, the skill asks once before any work; if you decline, it runs the phases inline in the current session instead.

Questions on the first run: Except in a lite, brief, or goal project, the first run lists the plan's phases and asks which checkpoint behavior you want: stop after every phase (the default), after specific phases, or only after the final phase. Setting workflow.hillCheckpointDefault to every or final answers this in advance. It then asks whether to run an extra lifecycle review automatically at each checkpoint, unless workflow.autoReviewAtHillCheckpoints is set. Both answers are written to plan.md and are not asked again when you resume. A lite project has no checkpoints and skips both questions. A brief or goal project skips them too unless its oat_plan_hill_phases lists phases explicitly; for those modes, [] means no checkpoints.

Brief projects: Each ## Phase pNN: block in the brief is one phase-unit with Intent and Exit evidence instead of planned tasks. The root records the phase's **Base:** in a phase-start commit before dispatch, the committing owner opens ### Task pNN-tNN execution records in implementation.md as work happens and writes **Head:** when the phase's work ends, a fresh reviewer reviews the anchored Base..Head range, and only the root writes **Status:** completed once review dispositions and selected gates settle. Progress and the next-phase decision count phase-units, never records.

Goal projects: every brief rule above applies, and each run gets a scope from the router: the active milestone's ordered phase set, a recovery scope for an older delivery, or the terminal scope after the goal is declared met. Implement never widens a scope to another milestone's phases. When every phase in the milestone's scope is accepted, it runs the scoped milestone closeout: the implement exit gate, written to oat_milestone_gates[mNN].exit, then oat_milestone_status: reviewing and a hand-off to oat-project-review-provide with code mNN: <ordered phase ids>. It never activates a milestone, registers a delivery, or writes declared_met. Terminal closeout starts only after the declaration, and when delivery coverage already holds at the pr step's position it records that step as satisfied_by: { pr: delivery-coverage }.

What it does without asking: After those questions, the run continues until a checkpoint, a blocker or the end of the plan without asking again, except for how to run the final code review (described after this list). It:

  • dispatches a phase implementer subagent (oat-phase-implementer) for each phase and an oat-reviewer subagent to review each phase, without a prompt per launch (when the host cannot run those subagents, it does the same work inline);
  • has the implementer commit once per task, and adds a bookkeeping commit after task commits and at every phase and review boundary;
  • sends a phase with blocking review findings back to its implementer for fixes and reviews it again, up to the retry limit;
  • for phases the plan marks as a parallel group, creates one worktree per phase, runs them at the same time and merges the passing phases into your branch with git merge --no-ff;
  • for a synced project, pushes each bookkeeping update to the project's ref on origin instead of committing it on your branch;
  • runs final verification and, once the final code review has passed, the implementation exit gate if one is configured;
  • can push your branch and open a pull request at the end, as described next.

The final code review may ask first: the final review is always required. In an interactive run with workflow.reviewExecutionModel unset, the skill asks how to run it: through a subagent in this session, in a fresh session where you run oat-project-review-provide code final yourself and then return, or inline when the current host's controls are verified equivalent. You then run oat-project-review-receive to process the findings. Critical or High findings become fix tasks, and the review repeats for at most three cycles. When the setting is subagent, the skill dispatches the reviewer without asking; inline runs the review in the current session only when that route passes the skill's check; fresh-session prints instructions and waits, while offering to run the review here instead. An autonomous run (OAT_AUTONOMOUS=1) asks nothing: it runs the final review and processes its findings immediately.

Finishing can open a pull request: In a lite project, once the final review and the implementation exit gate pass, implementation runs oat-project-pr-final with no approval step. That skill pushes the current branch to origin (git push -u origin <branch>) and opens a GitHub pull request with gh pr create, without asking you to confirm either step. A lite project always ends this way; no setting removes the PR step. A non-lite project does the same when workflow.postImplementSequence is pr or docs-pr (or a structured value that includes pr), and in an autonomous run (OAT_AUTONOMOUS=1) where that setting is unset. With pr, docs-pr or an autonomous run, the summary step (and, for docs-pr and autonomous runs, the documentation step) runs first, and the PR is opened before the final checkpoint asks for your approval. Otherwise no PR is opened automatically: when the setting is unset and the run is interactive, the skill offers the summary, documentation and final-PR steps and waits for your choice; when it is wait, the skill only reminds you to run them yourself. Implementation never merges the pull request or releases anything.

To avoid a pull request you did not want:

  1. Run implementation on a feature branch, never on your default branch: the push goes to whatever branch is checked out.
  2. Before starting a non-lite project, check oat config get workflow.postImplementSequence. Leave it unset or set it to wait if you want to open the PR yourself, and do not run with OAT_AUTONOMOUS=1. See Configuration.
  3. Use the lite workflow only when a PR at the end is what you want.

Example scenario: Your checkout-hardening project uses the quick workflow and has an approved plan with three phases: validate input, update callers, document the behavior. Run the dry run to check the order and the selected dispatch tier. Start implementation: because no dispatch policy is configured, the skill asks you to choose one, then asks which phases should be checkpoints, and you choose the final phase only. The agent dispatches an implementer for p01, which commits each task, then dispatches a reviewer. The reviewer reports a blocking finding, so p01 goes back to its implementer for a bounded fix and is reviewed again before p02 starts. After p03, the final review passes and the skill stops at your final checkpoint. After you approve, because workflow.postImplementSequence is unset and the run is interactive, it offers the closeout steps instead of opening a PR.

Expected output: Verified task commits, recorded phase outcomes and independent review results, with project tracking committed (or, for a synced project, pushed) at each bookkeeping boundary. A configured HiLL checkpoint or a real blocker may stop the run before the whole plan is complete. Depending on the workflow and workflow.postImplementSequence, the run may end with a pushed branch and an open pull request, as described above.

Next step: Follow the reported checkpoint or blocker. After an interrupted run, invoke the skill again against the same project: it cross-checks recorded task state, commit history and existing subagent and review records before resuming. Do not mark tasks complete by hand to skip a failed check. If you implemented additional commits yourself, use reconciliation before resuming. Finishing the last task is not the end: the final review and the implementation exit gate must still pass. When they do in an interactive, non-lite run with workflow.postImplementSequence unset, the skill offers the closeout chain oat-project-summary → oat-project-document → oat-project-pr-final. You can run all three, run summary and PR only, or exit and run them later. Project completion comes only after the PR is open.

oat-project-reconcile

Reconciliation reconnects existing Git history to the approved task list. It does not implement unfinished work, change production code or rewrite history. Use it after manual implementation, not as a substitute for planning or verification.

Needs an active OAT project: yes. If no valid active project is set, the skill asks which project to use and sets it as the active project. You can make the target explicit beforehand with project open.

Invocation:

/oat-project-reconcile

Prerequisites: The project has task definitions in plan.md and is either in implementation or has completed its planning phase. There must be commits not yet recorded in implementation.md. If every relevant commit is already tracked, the result is “nothing to reconcile,” not duplicate task entries.

What it does without asking: Nothing is written until you confirm the proposed mapping. After you confirm, it updates implementation.md, state.md and, when changed, plan.md, and records them in a single chore(oat): reconcile manual implementation (…) commit. A synced project pushes that change to its project ref on origin instead.

Example scenario: You manually committed a parser fix and its tests while pairing with a teammate. OAT still lists that task as pending, and a separate documentation commit does not clearly belong to a planned task. Reconciliation shows the post-checkpoint commits and proposes mappings using task IDs, changed files and other evidence. You confirm the parser task, mark a partially finished documentation task in progress, and decide whether unrelated work is logged as unplanned or skipped. Only then does the skill update tracking.

Expected output: A commit-to-task report with confidence levels, unmatched commits and remaining tasks. After confirmation, it appends implementation evidence without overwriting prior task entries, updates progress pointers and saves the tracking changes in one bookkeeping commit. Synced-project bookkeeping uses the project's sync flow rather than staging its artifacts on the implementation branch.

Before confirming the report:

  1. Check the proposed checkpoint and commit range. Merge commits, bookkeeping-only changes and already-recorded commits are filtered out.
  2. Review uncertain mappings rather than accepting a filename match as proof of completion. Multiple commits can belong to one task.
  3. Choose completed or in-progress status for each mapped task. A commit can represent only part of the planned work.
  4. Decide explicitly what happens to unmatched work; reconciliation does not silently invent a new task or claim it satisfied a requirement.

Next step: Run implementation for remaining tasks, or request a project review that includes the reconciled changes. Reconciliation leaves implementation in progress even if every planned task has a commit: review and finalization must still establish whether the project is ready to close.