Open Agent Toolkit

PR Flow

Two PR paths:

  • oat-project-pr-progress: progress PR for one phase or partial scope
  • oat-project-pr-final: final project PR into main

In a goal project both skills register deliveries instead: a progress PR is a milestone delivery, and pr-final registers terminal deliveries rather than a separate final PR.

Inputs

Expected artifacts:

  • Required (all modes): plan.md
  • Required (spec-driven mode): spec.md, design.md
  • Optional (quick/import): spec.md, design.md
  • Not expected (lite): discovery.md, spec.md, or design.md
  • Not expected (brief): discovery.md, spec.md, or design.md; the Project Brief in plan.md and the per-phase journal in implementation.md are the sources
  • Not expected (goal): as brief; the Project Brief with its ## Milestones table, the journal, and the goal state in state.md are the sources
  • Recommended (quick mode): discovery.md
  • Recommended (import mode): references/imported-plan.md
  • Recommended: implementation.md final summary
  • Recommended: summary.md — pr-final treats it as the primary source for the PR Summary section and automatically refreshes it first when missing or stale
  • Lite source row: oat-project-pr-final uses the plan's Summary, Decisions, and Validation Criteria plus the implementation.md Final Summary; it does not create summary.md unless lite closeout explicitly opts in
  • Brief source row: summary.md is required as in quick; its sources are the brief's Goal, Outcomes, Approach, and Decisions, the journal's accepted phases and Outcomes audit, and the review rows. Progress PRs scope a phase or pNN-pMM run from the journal's **Base:**/**Head:** anchors rather than a commit-message search
  • Goal source row: a progress PR is a milestone delivery. Its scope is the milestone's ordered phase set, or a registered delivery's frozen scope; its Git range runs from the set's first anchored base to its last anchored head and discloses other milestones' phases inside it. The PR is created only after oat project delivery check reports status: ok and a registering entry is committed to oat_deliveries. pr-final registers terminal deliveries for uncovered accepted phases instead of opening a separate final PR
  • Required gate for final PR: review table final row should be passed (goal: pr-final does not read the final row; each delivery it registers needs a passed, fresh integrated review and an allowed, fresh exit carrier instead)

Output

Local artifact path:

  • .oat/projects/<scope>/<project>/pr/*.md

GitHub PR body policy:

  • Keep YAML frontmatter in local artifact
  • Strip frontmatter from submitted PR body

For a synced project, PR creation follows a six-step order:

  1. write and format the local PR artifact;
  2. run oat project push so the project ref contains the latest artifacts;
  3. run oat project links --format markdown to generate the delimited links block from that exact ref commit;
  4. include the block in the submitted PR body;
  5. persist oat_pr_status and oat_pr_url in state.md; and
  6. push again so subsequent artifact writes can refresh the open PR body.

The generated block links only discovery.md, design.md, and summary.md when present. The URLs are pinned to the project ref's exact commit SHA rather than a moving branch name. plan.md, state.md, implementation.md, and reviews/ are intentionally excluded because they contain agent-facing execution detail rather than the reviewer-oriented project narrative. See Reviewing OAT PRs.

Post-PR state

After oat-project-pr-final creates the PR, state.md transitions to oat_phase_status: pr_open. This signals "awaiting human review" rather than "done."

pr_open is the routing/review posture. Actual PR existence is tracked separately in:

  • oat_pr_status — lifecycle state for the PR itself (ready, open, etc.)
  • oat_pr_url — the tracked PR URL when a PR exists

From pr_open:

  • Feedback received: run oat-project-revise to create revision tasks and re-enter implementation
  • Ready for completion: run oat-project-complete to finalize and archive the project. If oat_pr_status: open is already tracked, completion skips asking whether to open a PR again and can show the tracked oat_pr_url in its summary.

Both completion orderings are supported:

  • Complete before merge: run oat-project-complete while the PR is open, then merge.
  • Merge before completion: merge the PR first, then run oat-project-complete.

An open PR is not a completion blocker. When completion archives project artifacts, the archive-aware flow regenerates and synchronizes the open PR body so its artifact links remain valid. Synced completion makes refs/oat/completed/<project> authoritative at the verified source SHA. A same-SHA refs/oat/projects/<project> ref may remain only as an inert alias; the completed ref keeps the SHA-pinned links resolvable after the nested checkout and tracked record are removed.

Reference artifacts

  • .agents/skills/oat-project-pr-progress/SKILL.md
  • .agents/skills/oat-project-pr-final/SKILL.md
  • .oat/projects/<scope>/<project>/pr/